Airport Master Plan

The Port of Bremerton intends to develop a 2012-2032 Airport Master Plan to replace the 2004 Airport Master Plan for Bremerton National Airport. The Master Plan will provide the Port with a plan to address the development needs at the airport for a 20 year planning horizon (2012-2032) and will develop a realistic program for implementation within known funding constraints. Century West Engineering (Consultant) has been retained by the Port to accomplish the Master Plan. The Consultant will work in close liaison with the Port and Airport Management staff, a Planning Advisory Committee, local business and stakeholder groups, the Federal Aviation Administration (FAA) and the Washington State Department of Transportation (WSDOT) Aviation to ensure that the plan truly reflects the airport's development needs.
As the plan is developed, links to related materials will be shown below.
 
Airport Master Plan Information Page